Engius intelliRock Concrete Maturity Website

intelliRock PCL Specifications

Industry Specifications

PCI - Requires that the time-temperature relationship for the entire curing period be recorded for accelerated curing cycles.

Reference: Manual for Quality Control for Plants and Production of structural Precast Concrete Products.

NPCA - Requires that temperatures are monitored and documented at least once per week when using supplemental heat to accelerate curing.

Reference: NPCA Quality Control Manual for Precast Concrete Plants

DOT's - Many DOT's have relevant temperature monitoring specifications. Contact our local Engius representative for more information.

 

 

Related Information