intelliRock PCL Specifications
Industry Specifications
PCI - Requires that the time-temperature relationship for the entire curing period be recorded for accelerated curing cycles.
Reference: Manual for Quality Control for Plants and Production of structural Precast Concrete Products.
NPCA - Requires that temperatures are monitored and documented at least once per week when using supplemental heat to accelerate curing.
Reference: NPCA Quality Control Manual for Precast Concrete Plants
DOT's - Many DOT's have relevant temperature monitoring specifications. Contact our local Engius representative for more information.